We provide the Lender with on going risk mitigation throughout the entire construction process from contract execution to construction completion and a lien free endorsement.
We provide the Lender with on going risk mitigation throughout the entire construction process from contract execution to construction completion and a lien free endorsement.
We offer 3 distinct levels of loan monitoring:
Designed and built based on the most stringent lender policies but with the flexibility to meet ANY lender’s needs.
Learn moreFull Funds Loan Monitoring includes monitoring and validating the full project budget, auditing and ensuring compliance for required draw back-up, conducting site inspections that verify the actual % complete as compared to draw requests and continued reporting with updated budgets after draws, change orders and reallocations.
Hard Cost Funds Monitoring includes monitoring and validating the construction contract budget, auditing and ensuring compliance for required draw back-up, conducting site inspections that verifying the actual % complete as compared to draw requests and continued reporting with updated budgets after draws, change orders and reallocations.
Inspection-Only services provide professional site inspections that verify the actual % complete as compared to draw request. Lender requests inspections as needed and provides current draw sheet for each inspection.
At CLM Group project data information is collected to provide you with information and can provide advanced project analytics. Throughout the life of the project CLM can provide targeted analysis including:
Full Funds | Hard Cost | Inspection Only | |
---|---|---|---|
Budget | CLM prepares full project control budget Including:
| CLM prepares project control budget Including:
| CLM does not prepare control budget |
Draws | CLM processes requests for both Hard Cost and Soft Cost CLM balances project budget including both Hard and Soft Costs CLM tracks and balances the total SOURCE and total USE throughout the project | CLM processes requests for Hard Cost only | CLM will review the hard cost draw that the Lender provides to CLM in conjunction with the request for inspection CLM will report on physical % complete of the overall project We will recommend deductions for items not compatible with the current draw |
Audit | CLM will collect and verify compliance for:
| CLM will collect and verify compliance for:
| CLM does not collect or review any draw support documentation |
Reports | CLM provides:
| CLM provides:
| CLM provides:
|
Date Down | CLM:
| CLM:
| CLM does not collect Notice of Completion or Unconditional Final Lien Waivers |